Ductwork up to ceiling height is part of the lot.
Buyers are responsible for loading, transporting and professional dismantling. If necessary, piping and electricity must be capped.
Damage to property/property can be recovered from the buyer.
Category | Remaining parts |
Brand | ISEl |
Model | ICP 4030 |
Construction year | 2017 |
Reference | A1-33232-2 |